# How to write a tender response

> A step-by-step guide to writing a UK tender response: reading the pack, answering to the award criteria, word limits, evidence, pricing and final checks.

Canonical: https://tenderswift.app/guides/how-to-write-a-tender-response
Last updated: 2026-11-17

A good tender response answers exactly what the buyer asked, in the format they asked for, with evidence for every claim. This guide walks through the process UK bid teams use.

## 1. Read the whole pack first

Read the invitation to tender, specification, evaluation criteria, pricing schedule, terms and any clarifications before writing a word. Instructions about format, word limits and mandatory documents are often in a different file from the questions themselves.

## 2. Decide whether to bid

Check the pass/fail requirements (insurance levels, accreditations, financial standing), the contract value against your capacity, and whether you can evidence the experience they ask for. A quick no is better than a rushed, weak bid.

## 3. Answer the question, against the award criteria

Each quality question is marked against published criteria and weightings. Mirror the question's structure, cover every point it lists, and spend most effort on the questions worth the most marks.

## 4. Evidence, not claims

Back each statement with something checkable: a case study, a KPI, a named accreditation, a process the evaluator can picture. "We are committed to quality" scores little; "we hold ISO 9001 and resolved 98% of service calls within SLA last year" scores well, if it's true.

## 5. Word limits and format

Keep to every word or character limit; text beyond it is often ignored. Use the buyer's template, keep their numbering, and don't add attachments they didn't ask for.

## 6. Social value

Most public sector tenders now weight social value. Make commitments that are relevant to the contract, measurable and that you can deliver and report on.

## 7. Pricing

Price the full scope against the buyer's budget, compare like with like (per year or whole term, with or without extensions), and stay within any cap.

## 8. Attachments and a final compliance check

List every document the buyer asks for with the bid, check each one is current and signed, and read the whole response against the instructions one last time before submitting.

## Frequently asked questions

### What is an ITT?

An invitation to tender: the buyer's pack inviting suppliers to submit a response, with the questions, specification and rules for the procurement.

### How are tender answers scored?

Against the award criteria and weightings published in the tender documents, usually on a scale such as 0 to 5 for each quality question, alongside price.

### Can I ask the buyer questions?

Yes, through the clarification process before the clarification deadline. Answers are usually shared with all bidders, without saying who asked.

## Related

- https://tenderswift.app/features/ai-tender-writing
- https://tenderswift.app/guides/tender-questions-and-answers
- https://tenderswift.app/guides/social-value-in-tenders
- https://tenderswift.app/features/tender-pricing
